Radimpex Tower Crack [better] Jun 2026
| Date & Time | 12 March 2025, ~14:20 CET | |-------------|--------------------------| | | A longitudinal crack (≈2 cm wide, 1.5 m long) appeared on the north façade at the 12th‑floor level. | | Immediate Response | 1. Evacuation of all occupants (≈450 people). 2. Activation of the building’s fire‑alarm/evacuation system. 3. Securing of the site by the city’s emergency services. | | Observations | • The crack ran parallel to the vertical mullion joints. • Slight deflection of the curtain‑wall panel was noted. • No audible “pop” or vibration reported. | | Subsequent Development | Over the next 48 hours the crack widened to ≈4 cm and began to propagate upward, prompting a full structural assessment. |