Required for thick carbon steel vessels to relieve residual stresses caused by welding, preventing brittle fracture later.

Establishing the basic project foundation, identifying the problem the equipment must solve, and conducting initial feasibility studies.

Includes Pumps, Compressors, and Turbines.